Geothermal Play-Fairway Analysis of Washington State Properties Award Number: DE-EE0006728 CX(s) Applied: A9, B3.1 Geothermal Technologies Office Date: 03/04/2016 Location(s): WA Office(s): Golden Field Office
Bothell-Sno-King No. 1 and No. 2 Transmission Line Upgrades CX(s) Applied: B4.13Date: 03/04/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Energy OutWest Peer Exchange Award Number: DE-EE0006298 CX(s) Applied: A9, A11 Weatherization & Intergovernmental Programs Date: 02/21/2014 Location(s): WA Office(s): Golden Field Office
Fiscal Year 2016 Danger Pole Replacement Project for Fidalgo-Lopez #5 Structure 7/1 CX(s) Applied: B1.3Date: 02/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
McNary-John Day Transmission Line Mile 34-38 Access Road Repair Project CX(s) Applied: B1.3Date: 02/09/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
BPADNR Culvert Replacements CX(s) Applied: B1.3Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Knight to Wautoma Fiber Project CX(s) Applied: B4.7Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
NoaNet Fiber Installation at Columbia Substation CX(s) Applied: B4.7Date: 02/01/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Electric Lightwave Fiber Optic Cable near Columbia Substation CX(s) Applied: B4.7Date: 01/25/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross Complex Bridge and Speed Feedback Sign Project CX(s) Applied: B1.13Date: 01/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration