Addy-Cusick No. 1 Mile 20 to 22 Road Improvement & Ford Construction CX(s) Applied: B1.3Date: 04/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Big Eddy-Redmond Transmission Wood Pole Replacement CX(s) Applied: B1.3Date: 04/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
National Oceanographic and Atmospheric Administration Sockeye Salmon Captive Broodstock Program Routine Maintenance CX(s) Applied: B1.3Date: 04/06/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Kitts Corner Wireless Communication Facility CX(s) Applied: B1.19Date: 03/31/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Surprise Lake Substation Sale of Land Rights and Equipment CX(s) Applied: B1.24Date: 03/28/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Cape Horn Vista Land Acquisition CX(s) Applied: B1.25Date: 03/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Sale of Structure 2/6 of East Ellensburg Tap to Columbia-Ellensburg No. 1 Line CX(s) Applied: B1.24Date: 03/21/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Reduction of System Cost Characteristics Through Innovative Solutions to Installation, Operations, and Maintenance Award Number: DE-EE0007347 CX(s) Applied: A9 Water Power Program br> Date: 03/18/2016 Location(s): WA Office(s): Golden Field Office
Equipment Additions to Multiple Substations and Radio Facilities CX(s) Applied: B1.7Date: 03/14/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Survivability Enhancement of a Multi-Mode Point Absorber Award Number: DE-EE0007346 CX(s) Applied: A9, B3.6 Water Power Program Date: 03/10/2016 Location(s): WA Office(s): Golden Field Office