Longview-Allston No. 1-2, Structure 2/2 Slope Inclinometer Installation CX(s) Applied: B3.1Date: 05/05/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Verizon Franklin Park Wireless Installation CX(s) Applied: B1.19Date: 05/02/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Grandview Substation Upgrades CX(s) Applied: B4.1Date: 05/02/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Alcoa Power Sales Contract Amendment No.3 CX(s) Applied: B4.1Date: 04/26/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Echo Lake-Maple Valley No.1 Footing Repair Project: Structure 10/2 CX(s) Applied: B1.3Date: 04/22/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Grandview-Red Mountain #1 Wood Pole Replacement CX(s) Applied: B1.3Date: 04/20/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Fiscal Year 2016 Wood Pole Replacement – Grand Coulee Transmission Line Maintenace CX(s) Applied: B1.3Date: 04/19/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Addy-Cusick No. 1 Mile 20 to 22 Road Improvement & Ford Construction CX(s) Applied: B1.3Date: 04/18/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Big Eddy-Redmond Transmission Wood Pole Replacement CX(s) Applied: B1.3Date: 04/12/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration