Ross-Lexington 12/2 Tower Stabilization Project CX(s) Applied: B1.3Date: 07/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Modified Thermoresponsive Hyperbranched Polymers for Improved Viscosity and Enhanced Lubricity of Engine Oils CX(s) Applied: A9Date: 07/16/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Acquisition of Multiple Access Road Easements for the Holcomb-Naselle No. 1 Transmission Line CX(s) Applied: B1.42Date: 07/09/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Washougal Vegetative Maintenance - LURR 20150160 CX(s) Applied: B4.9Date: 07/08/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Longview Osmose 2015 Corrosion Mitigation and Repair Project CX(s) Applied: B1.3Date: 07/02/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Puget Sound Energy Fiber Connection CX(s) Applied: B1.42Date: 06/30/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Ross Complex Sally Port Entrance Relocation CX(s) Applied: B4.7Date: 06/25/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Aberdeen Substation (Grays Harbor PUD) Tree Clearing CX(s) Applied: B1.32Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
St. Johns-St. Helens Transmission Line Access Road Improvements CX(s) Applied: B1.3Date: 06/24/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Frontier Observatory for Research in Geothermal Energy - Newberry Volcano, OR (Phase One) CX(s) Applied: A1, A9, A11Date: 06/24/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory