Categorical Exclusion Determination
Office of NEPA Policy and Compliance
October 13, 2017Bonneville Power Administration (BPA) proposes to allow MCI Metro to string aerial fiber optic cable on an existing distribution line that crosses BPA fee-property. The cable stringing would occur on a Clark Public Utility District distribution line that is perpendicular to BPA’s Ross-Lexington No. 1 line, between towers 19/4 and 19/5. All work on BPA property would take place above ground along NE Cedar Creek and NE Elna roads, using bucket trucks and climbers. No ground disturbance is proposed.