Communication Equipment Removals (#WC Projects) CX(s) Applied: B1.19Date: 10/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Midway Substation Upgrades CX(s) Applied: B4.6Date: 10/20/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
CHPRC Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Asbestos Removal CX(s) Applied: B1.16Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Routine Maintenance CX(s) Applied: B1.3Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Ross Warehouse Asbestos and Lead Paint Abatement CX(s) Applied: B1.16Date: 09/21/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Balancing Authority Area Services Agreement with Georgia-Pacific Consumer Products (Camas) LLC CX(s) Applied: B4.1Date: 09/16/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Pilot Proposal for Reducing the Cost of Carbon Dioxide Capture and Compression-Advanced Carbon Dioxide CX(s) Applied: B3.6Date: 09/15/2015 Location(s): WashingtonOffices(s): National Energy Technology Laboratory
Chief Joseph-Foster Creek Underground Fiber Optic Cable Installation CX(s) Applied: B4.7Date: 09/14/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration