A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
Removal of presumed asbestos containing material (PACM) gaskets to replace plastic relief valve (PSV 002) for Phosphate pump 002 located inside 789…
Remove from SRS Trailer 703-18B, Executive Mobile Portalet 724-42E (located in B Area), and 3 transformers. Relocate Trailer 703-18B to Z-Area. De…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
A supplemental purge ventilation system is required to support the Pulse Tube Agitator (PTA) operation in FPP-1 during future transfers. Higher ve…
Repair deck and stairs at Trailer 254-12F.…
Steam line insulation removal to identify and fixed leak upstream of Valve PSS-V-7703.…
Uranium will be separated from radioactive sample matrices by use of UTEVA resin. Liquid residue will be created from the additional radioactive ma…
Testing the use of electrolytic dissolver to dissolve a variety of materials (e.g. stainless steel).…
Install additional receptacles and paint in Room 135 of Building 730-2B.…