Site Infrastructure personnel perform recycling activities for Universal Waste Batteries from various locations at SRS.…
Wash/clean, caulk, and repaint Trailer 704-74F.…
Removal of possible asbestos gasket from Pressure Safety Valves (PSV) PSV6013/PSV6014/PSV6016/PSV146 at 717-F Construction Bay Low Pressure Piping …
Troubleshoot and repair Heating Water Circulating Pump #006 in Building 735-1B.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…
The purpose of F-DCF-H-00743 is to create an “Electrical Airgap” between Buildings 234-H and 236-H. Fire alarm and detection equipment within Build…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…
Painting the exterior of Building 701-1L.…
Isolate electrical power, generator power and utilities (steam, water, air) to Building 235-F, 235-1F, 235-2F, 607-3F and Cooling Tower 285-11F. Ve…
The Emergency Operations Center (EOC) has operated beyond its expected lifetime and has become inadequate to provide necessary response for possibl…