607-70G Remove insulation from process water line in Ditch 1.…
Remove, replace, reinstall MST-TRP-001 (steam trap) associated piping, insulation (non-asbestos), and potentially asbestos containing material (PAC…
Remove two presumed asbestos containing material (PACM) gaskets from Recovery Well 8 to allow for routine maintenance.…
Upgrade 254-5H Diesel Fuel Level/Leak Detection System with a Veeder Root Level/Leak Detection System.…
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…
The partial closure of the F-Area Inactive Process Sewer Line (FIPSL) Treblers (904-108G and 904-47G).…
CX-020017: K-Area Electronic Safeguards and Security System (E3S) Replacement & Argus Implementation
This modification will replace E3S in K-Area with the Lawrence-Livermore National Laboratory (LLNL) Argus Security System.…
The proposed activity (PA) is for the design/implementation of DCPs, see below, and the migration to M580 Hardware, see CMTs below, for PCMs 0-5, a…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …