Re-Insulate 931- condensate tank and associated piping.…
This activity will be to develop a method to characterize the synthesis of Palladium particles from a palladium precursor.…
Replacement of Area Velocity Flow Sensor at Stream Surveillance Location FM-A7…
Replace carpet in IT Area in 730-4B 1st Floor.…
A new domestic water well will be installed for the Barnwell Barricade.…
The activity consists of flowing Ar or N2 through a packed bed of porous zero valent iron (p-ZVI) to measure the pressure drop across the bed.…
SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offistew…
Air gapping of mechanical lines to isolate building 236-H.…
Install VTC in room 344 of 730-1B.…
Push 3 CPTs down to lower part of Lower Aquifer Zone (LAZ) for lithology.…