This proposed activity includes the installation of a new SAS storage bed and replacing the existing Carbon Steel Nitrogen Exhaust Line for the SAS…
Subcontractor will provide roof repairs to Building 717-2B. The Subcontractor will not disturb the existing roof while performing these repairs on …
General Powder/Solid Material Combination Studies to evaluate various combinations of powder/solid material for fabrication into a durable form.…
Welding repairs on Steam Lines.…
This activity installs a new vendor-designed, skid-mounted chemical feed system adjacent to the north side of the 285-11H Cooling Tower return flum…
Remove pressure relief valve H-284000-DW-PSV-001 on water heater located inside Building 284-H. Water heater is to be abandoned in place.…
HB-Line will be entering Lay-Up status. The Process Air (PRA) system for HB-Line will not be needed to support the facility while in this configura…
Legacy insulation needs to be removed from Rm 602 in HB-Line. The insulation will be handled as asbestos.…
Construction will take an asbestos sample from electrical enclosures in the 4th Level Control and Hot Gang Valve Corridor…
Fabricate and install an aluminum cover over existing well northwest of Trailer 247-19F.…