Remove and replace the defective seal on the #5 Cone Valve at the 681-3G Pump House. Seal is suspect asbestos.…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in R…
Prep and paint pump skid at Waste Solidification Building (WSB).…
Five office trailers, one bathroom trailer and one handi-house in L-Area will be removed and replaced.…
Isolate the KAC Cf-252 Shuffler, Shuffler Instrumentation Cabinets, and Shuffler Room lighting and receptacles from all Electrical Power Sources an…
Safely remove from SRS property trailers 772-29G, 782-5G, and 782-10G. Safely demolish SRS property trailer 782-13G. Demolished trailer will be di…
Replace the tile and carpet in the 105-K Personnel Wing Ladies Restroom and Locker Room.…
Paint Rooms 243, 244, 334, 336, and 337. Replace carpet in Room 243. Activities will occur in Building 730-B.…
Existing detection equipment in the L-Area Perimeter Intrusion Detection Assessment System (PIDAS) are to be removed and replaced with newer model…
Install a new chain link fence for the switchyard at SCE&G substation 72 (751-B).