Replace all exterior light fixtures on 233-23H and 233-24H with LEDs.…
A single partial can of Leak-Tec 72V was found during a review of the gloveboxes as part of the facility lay-up preparations. Waste removed from t…
SUD/Construction to paint air release valves on the river water system. Scopes include cleaning, prepping, and painting.…
Install compressed gas cylinder bottle rack outside of K-Disassembly Basin, 105-K…
Work will include replacing some ceiling tiles, fixing holes in walls, painting walls and doors, and fixing/repairing the cove base. No asbestos c…
SUD to paint various equipment sitewide. Scopes include cleaning, prepping and painting. …
This Laboratory Directed Research & Development (LDRD) is designed to evaluate the viability of a self-propagating synthesis method to stabilize an…
Fourier Transform Infrared (FTIR) uses a beam of infrared light to analyze a sample in a non-destructive manner. The samples are returned to custo…
This activity is ongoing and involves the operation and maintenance of an Ion Chromatography (IC) system(s) in 773-A B-134 containment units CHEX h…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containing mater…