Remove presumed asbestos containing material gaskets and replace PSV-001 on Soda Ash Pump 001 in Building 789-B.…
Remove presumed asbestos containing material gaskets and replace PSV-002 on Soda Ash Pump 002 in Building 789-B.…
Repair floors in Trailers 704-37E and 704-29E, including removal and replacement of floor and cove base.…
Valve H2-241125-FP-V-053 (Fire Protection Valve) will be replaced with a like-for-like valve. Valve is leaking. Remove and dispose of asbestos gask…
Remove all coatings down to the original concrete floor in Room 16 of Building 705-N.…
Remove soil saturated with diesel fuel at Building 703-A, C-Wing.…
The Subcontractor will caulk 30 feet at parapet/expansion joint to stop leaks at Building 284-20H. The Subcontractor will disturb the existing roof…
Savannah River Tritium Enterprise and Savannah River National Laboratory have implemented Digital Imaging and Measurement System, which uses digita…
The north medium bay roll-up door on Building 717-F no longer functions. The north medium bay roll-up door will be replaced, including the door, do…
The men’s rest room has flooded and caused floor damage in Bathroom Trailer 704-73E requiring floor replacement for entire trailer. Construction wi…