719-N Prep and Paint 8 Concrete Bollards for High Visibility …
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…
Award Number: DE-EE0008730, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): SC, Office(s): Golden Field Office
Subcontractor will provide roof repairs at Building 717-12F. The Subcontractor will not disturb the existing roof while performing these repairs on…
The Sikaflex sealer in the joints at the Heavy Water Component Test Reactor (HWCTR) have degraded. The existing material will be removed via wire w…
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by AD at SRNL (A Area).…
This proposed activity will repair damage to the 221-H roof in an HB-Line storage area resulting from scaffling being blown over during a storm eve…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Soil Neutralization Amendments for the D-Area Coal Storage Area…