A series of non-rad tests will be performed to study the oxidative destruction of glycolate and/or tetraphenylborate containing solutions.…
Nitrate salt simulants containing varying water concentrations will be combined with organic, wheat, kitty litter for thermal aging studies in anAc…
Construction personnel will remove asbestos insulation in the Hot Gang Valve Corridor and replace with non-asbestos insulation.…
The scope of this work is the extraction of deuterium oxide and singly-deuterated water from water and deuterium oxide mixtures using combinationso…
Install Universal Wiring, UW, in Building 703-47A.…
Construction personnel will seal asbestos insulation on the duct located in the closet of Room 125 - Building 704-H.…
Inspection and treatment of wood 13.8kva Feeder power poles in L-Area.…
Remove building 707-11F and dispose in C&D Landfill.…
Overhaul of Shone Ejector number 2 located at 607-2A.…
The ICW Booster Pump and motor need to be replaced due to age.…