Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…
Remove designated areas of crusher run and replace with asphalt.…
Repair chill water leak in Air Handling Unit number 4.…
Replace carpet, floor covering, and cove base in Building 707-F.…
Replace 16 1000W HID lighting fixtures in 717-F Jumper Shop bay with a comparable LED type, Lithonia Model number JHBL 45000LM ACL WDMVOLT GZ10 40K…
Pending the completion of renovation activities in 773-A, B-147 and 151 Analytical Development Section (ADS) will install and operate an Agilent770…
Subcontractor will provide roof repairs at Building 716-4A.…
773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
SRNL will use an organic carrier to introduce a metallic or ceramic compound to the internal surface of a pinch weld and then conduct pinch weldtri…
Inspection and treatment of wood utility and power poles along Burma Road, including ACP, Waste Water Treatment, and other G-Area facilities.…