Overhaul pump EFP #1 at 902-5B.…
Install new ATM Saphir 550 polisher/grinder assemblies and laboratory sink in 234-7H and D&R existing Buehler polisher/grinder assemblies. Replace…
Remove receptacles and non-load bearing wall between Rooms10 &11 in Building 773-63A.…
Remove and reinstall insulation from Service Water (SW) Pump 003 so that check valve can be replaced.…
Painting interior of 701-1L…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Main Feeder Utility Pole Treatment requiring soil disturbances within the B, D, L, K, and General Technical Areas. …
Replace failed flow transmitter for RWM-02 Recovering Well located in A/M Areas. …
The obsolete discrete HVAC controllers in HB Line will be replaced with DCS control.…
As part of the larger site Lab Consolidation effort, F/H Analytical Laboratory (F/HAL) is preparing to transition multiple labs to Inactive or La…