The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the s…
Dominion Energy is installing fiber optic cables on top of 115 kV structures from 151-1K (Station 14) to 151-2C (Station 15-2).…
Vendor to clean decomissioned 275-gallon diesel fuel tank.…
Subcontractor will provide roof repairs at 782-20G, 704-22G, and 704-25G.…
Modify Section B Main Floor Service Corridor and adjacent spaces to provide a contiguous contamination area between the lab modules in thisportion …
Install approximately 350 feet of duplex fiber optic cable (OS2-Singlemode (9/125)-Duplex-Fiber Optic Cable-FC to FC) from the EOCProjector Room (E…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
The process allows for obtaining simultaneous thermogravimetric and calorimetric measurements of materials (e.g catalysts).…
Subcontractor will provide roof repairs at 704-2H.…