Bulk and nano inorganic semiconductors and metallic nanoparticles will be synthesized and characterized for use as sensor and detectorelements.…
Subcontractor will provide roof replacement at 717-10N.…
Produce complex metal parts from 3D computer-aided design, CAD, models via electron beam melting.…
The sinks in the 704-L Men's Change Room are plugged.…
The 216-L Sump Pump discharge check valves 216-A and 216-H need to be replaced.…
MOX-Termination has determined that portable building SRS-PB-EX-0027 is now excess.…
Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Replace existing propane monitors at Building 754-11A.…
Four characterization soil bores northwest of the M Area Settling Basin to further characterize the high concentration VOC plume.…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…