Volatile compounds from resin curing and treatment will be collected into thermal desorption tubes or SPME fibers using dynamic headspaceanalysis.…
Installation and Operation of a R&D Vacuum Furnace in Building 723-A.…
As part of externally funded projects, aerosols will be generated and allowed to collect on a variety of substrates.…
Maintenance and Operation of transmission electron microscope, for example, the TEM in 773a c104.…
The ICW Booster Pump and motor need to be replaced due to age.…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…
Excavate to correct the underground domestic water leak Southeast of 281-15H…
Installation and operation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gasstandar…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforcedcompos…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…