Crystalline compounds of enriched uranium (U-235) will be fabricated via recrystallization of commercial compounds (uranyl nitrate and acetate) wit…
"The modification is being implemented to support the ""Layup"" plan to safely isolate or remove Structures, Systems, and Components (SSCs) no long…
This activity is to evaluate and correct lighting fixtures throughout various buildings in F-Area.…
Inspection and/or treatment of currently installed utility poles in E Burial Ground area…
Remove Portable Building 663-45G from service/use and excess it for transfer to SRS Community Reuse Organization (SCRO). A new building of the same…
Due to a recent assessment of the air surveillance program at SRS, it has been decided to build a new air surveillance station to ensure thorough s…
This work scope is to set-up and operate a newly procured rope saw on the test wall at 666-E prior to utilizing in various areas across the site. T…
241-280H Replace Manway on Tanks 01 & 02 and remove existing gaskets.…
This activity is to evaluate and correct lighting fixtures throughout Building 706-4F.…
Remove all coatings down to the original concrete floor in Room 16 of Bldg. 705-N.…