Room 169 is being modified to accommodate office spaces throughout the room, resulting in deficient notification device coverage as required byNFPA…
Replace the packing in Return Pump #3 at 281-2H.…
Building 616-G has reached an end state and will be demolished.…
Upgrade 254-5H Diesel Fuel Level and Leak Detection System with a Pneumercator Level and Leak Detection System.…
Soil Neutralization Amendments for the D-Area Coal Storage Area…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Install Overfill Prevention Device on the Underground Storage Tank at 703-6B Heliopad.…
Relocating steam heater and associated electrical and piping per DCF.…
Evaluate and repair crane solenoid and breaker that is intermittenly tripping on low lift crane at 681-3G.…
Establish 3 new vadose zone lysimeter stations in E-Area on the north rim of ET3.…