The goal of the catalyst research is to create innovative materials and intellectual property. This project seeks to develop a high performance cat…
Passive counting of potentially radioactive samples using commercial radiation counting systems (i.e. alpha, beta, and gamma detectors/counting sys…
Subcontractor will provide roof repairs at Building 763-52N. The Subcontractor will disturb the existing roof while performing these repairs on Bui…
Subcontractor will provide roof replacement at Building 717-K. The Subcontractor will disturb the existing roof while performing this replacement o…
Award Number: DE-EE0008294, CXs Applied: A9, B5.16, Weatherization and Intergovernmental Programs Office, Location: SC, Office: Golden Field Office
Excavate 16,820 m3 (22,000 yd3) of ash and contaminated soil media from the boundary of the P-Area Ash Basin to the edge of the 30-m (100-ft) buffe…
Ten soil vapor extraction wells (SVE) wells will be disconnected from the Western Sector Treatment System (WSTS) active SVE system and reconfigured…
On Saturday, May 4, 2019, the fire water line west of 221-H South Dock failed. A sink hole was created by the water flow which caused a bollard to…
The DE vessel installed in Room 17 Diffuser System had two of four heater elements fail. In efforts to continue production, the remaining two heate…
Install a domed bubble mirror in Building 772-F men's change room ceiling to cover blind spot in the walkway near the south entrance. …