Subcontractor will provide roof repairs at 713-3N.…
Subcontractor will provide roof repairs at 703-B.…
LED upgrade of exterior lighting of building 247-H…
Renovate the 264-1H Rm 151 kitchen with new flooring, paint, countertops, and cabinets.…
This activity will evaluate the chemistry and engineering aspects of a process for stripping chloride from nitric acid solutions using heat, gas sp…
This activity is for the demolition of Building 717-33F, which is also known as MOX Building No. 90, and the removal and relocation of MOX sealandc…
This EEC covers various routine maintenance activities that occur in the buildings with the MOX Complex Area.…
The Tritium facility requested a laundry washer and dryer to be installed in 719-H.…
Design and Procurement of a TEF design Mg Bed to the replace the current HANM design Mg Bed Outer Shell…
Demo existing, rotting wooden structure and enclosure, SRS-PB-EX-0028, around compressor on south side of 731-2F.…