These two methods determine the concentration of oxygen/nitrogen/hydrogen and carbon/sulfur in various materials.…
Construction personnel will renovate the interior of Building 701-1H.…
Project Management & Construction Services (PMCS) operates an insulation fabrication shop at 717-10N.…
There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
Install a new laboratory hood in Building 773-A, Lab B-147 and 151 along with two Spectrometers and supporting services.…
Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Remove designated areas of crusher run and replace with asphalt.…
Repair chill water leak in Air Handling Unit number 4.…
Replace 16 1000W HID lighting fixtures in 717-F Jumper Shop bay with a comparable LED type, Lithonia Model number JHBL 45000LM ACL WDMVOLT GZ10 40K…