Replace carpet, floor covering, and cove base in Building 707-F.…
Pending the completion of renovation activities in 773-A, B-147 and 151 Analytical Development Section (ADS) will install and operate an Agilent770…
Subcontractor will provide roof repairs at Building 716-4A.…
SRNL will use an organic carrier to introduce a metallic or ceramic compound to the internal surface of a pinch weld and then conduct pinch weldtri…
773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self contained lowpower…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…
As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
Install two wall mounted HVAC units, or engineering approved equal, and any supporting electrical outlets or power sources.…