Seal K-Area sealand/seatrain roof with Blue Max sealant to prevent leakage.…
Existing high pressure sodium light fixtures in 233-H attic will be replaced with LED fixtures.…
Install a Shoreline Power drop in Building 709-7G for the reserve fire truck.…
Replace the ultra-violet disinfectant system at the effluent of the Central Sanitary Waste Treatment Facility (607-74G). …
This activity will study and develop the process conditions and equipment to calcine up to 1 liter batches of DGA resin in support of the Mk-18A pr…
Remove existing carpet, tile and mastic, abating asbestos and installing new carpet flooring within designated areas of Section A, Building 773-A.…
Measurement of hydrogen generation from SRS Tank Farm actual-waste samples at a series of temperatures with and without addition of glycolate.…
Fabrication of scientific glassware and apparatus for SRNL and SRS as needed. …
Crush and run will be applied to level the access path to Sampling Point PB-3 off of Highway 125.…
Subcontractor will provide roof repairs at 617-11G. The Subcontractor will disturb the existing roof while performing these repairs on 617-11G. The…