The activity will allow for introduction of air into the sample loop to "clean up" and evacuate tritium holdup.…
Install a second Quonset Building in the gravel parking lot north of the K-Area main parking lot and a Quonset Building in the K-Area ConstructionF…
Construct a new asphaltic pavement between Buildings 731-1N and 731-2N.…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Subcontractor will provide roof repairs at Building 703-10B.…
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…