Subcontractor will provide roof repairs at 707-C.…
Design and install a new DIMS to be installed in Room 28.…
It has been decided to generate a DCF to replace the Cuno filters with Porvair filters (formerely Fairey Filter Elements).…
Install an Electric Discharge Machine (EDM) in building 248-H (machine shop area) that requires a chilled water unit, electrical supply, instrument…
Remove the Inert Metallography Laboratory Tritium Recovery System (IML TRS) process chiller from service by providing air gap isolation of the chil…
Subcontractor will provide roof repairs at 713-2N.…
766-H life safety measures-Penetration seal work.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard.…
Create various blends of powder and aggregate materials for use in other projects to support K-Area and HB-Line.…
Inspection and treatment of all the wood poles (data, mechical, electrical) within the fence line of the Tritium Area per C-SOW-G-00038 Rev 2.…