Restroom trailers 742-10G and 742-11G built in 1993 (519 square feet each) will have services disconnected, and the trailers will be removed from t…
Construction Personnel will dismantle and remove Building 701-35H.…
Replace the existing Carbon Steel Nitrogen Exhaust Line for the SAS glovebox with Stainless Steel Piping and remove the old Dewar manifold.…
Electical receptacles to be installed in the Clerk and Shift Managers Offices in Building 105-K.…
Replace the old monitoring system with new technology (laser flow sensor) at the H-02 Outfall.…
Install a permanent ventilation system for the Sodium Nitrite Makeup Tank (SNMUT) to allow tank to vent directly to the atmosphere at the 422-S roo…
Site construction will prep and paint the curbs and traffic stripping around the exterior of 735-4B.…
This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops. This revision includes the installation of ad…
The Li'l Critter pump in building 723-A is used for pressure testing. Replacement of the Hydraulic Oil and process fluid in the Li'l critter pump i…
Laser sensor mounted on culvert to measure stream flow at A-11 Outfall culvert.…