This environmental evaluation checklist covers analytical methods to be performed in 773-A Labs B-003, B-046, B-105, B-107, B-138, B-145, B-154 and…
Savannah River National Laboratory will perform laboratory experimentation to determine the flowsheet parameters necessary to safely and efficientl…
The chilled water supply to the breathing air compressor (No. 2) after-cooler/moisture separator has a developed a leak in the ceiling adjacent to …
Replace positive crankcase ventilation 001 outlet isolation valves A1-901-SW-V-428 & A1-901-SW-V-429 at 901-A. Valves are leaking. Gaskets will be…
Remove suspect asbestos gaskets on discharge line at 905-103F.…
This work supports HB area by including, dissolution, separation/purification of Pu/Np solutions which may contain Pu, U, Fe, etc., via ion exchang…
Americium will be electrodeposited onto a solid substrate from an acidic media. …
A Non-Time Critical Removal Action will consist of an emulsified oil permeable barrier. Trees and vegetation will be cleared and lay-down areas cre…
Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to…
Excavate and repair underground Service Water link near Building 784-A. Leak is due to normal wear and tear. Replacement materials will be like-for…