Soil Neutralization Amendments for the D-Area Coal Storage Area…
A treatability study will be performed to inject natural artesian groundwater from two nearby production wells in D-Area into the upper water table…
Site Infrastructure personnel perform recycling activities for Universal Waste Batteries from various locations at SRS.…
The purpose of F-DCF-H-00743 is to create an “Electrical Airgap” between Buildings 234-H and 236-H. Fire alarm and detection equipment within Build…
Removal of possible asbestos gasket from Pressure Safety Valves (PSV) PSV6013/PSV6014/PSV6016/PSV146 at 717-F Construction Bay Low Pressure Piping …
Troubleshoot and repair Heating Water Circulating Pump #006 in Building 735-1B.…
Wash/clean, caulk, and repaint Trailer 704-74F.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…
Painting the exterior of Building 701-1L.…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…