Apply water-proof coating and sealant to newly installed plywood on top of cell No. 4 on 785-2A, Cooling Tower 2.…
Until a mission is identified for the facility, HB-Line will be maintained in a layup state.…
This EEC addresses the installation of 12 groundwater monitoring wells and eight injection points ...…
Four characterization soil bores northwest of the M Area Settling Basin to further characterize the high concentration VOC plume.…
766-H Repair sheetrock, install missing cove base.…
Replace Metal Halide lighting with LEDs inside Building 236-3F, WSB.…
717-8N and 717-9N Public Address System Installation…
Install a hands free water dispenser in the lobby of 730-2B.…
Replace floor tile in building 713-1N, Section A1, Corridor No. 2 hallway between offices N321 and N204.…
703-47A Sidewalk repairs.…