Renovation of restroom in Building 710-14N.…
Replace Trailer Space Roll Door Cover, North Side Purification. Door cover may contain asbestos/galbestos material and PCBs.…
This modification will replace the Electronic Safeguards and Security System (E3S) in the Tritium Extraction Facility (TEF) with the Lawrence-Liver…
The Lab 106 will be modified to provide space for SRNL Analytical Services to perform clean reagent preparation when their organization moves from …
This EEC covers the operation of the AccuTOF-DART time-of-flight mass spectrometer. Investigation of inorganic and organic chemicals on the surface…
Corrosion testing of stainless steel with simulated sea salt will be performed in 999-2W. …
The proposed work will involve studying effectiveness of VCIs (Vapor Corrosion Inhibitors) in the presence of bacterial activity.…
Install Multiquip Model DCA20SPXU4F (Serial# 7152346) Reciprocating Internal Combustion Engine (RICE) Unit (SRSR00594) at Tank 43H, H-Tank Farm.…
H Area Construction Personnel will remove insulation from a steam trap so that leak repairs can be made to the piping.…
Remove and replace water damaged flooring and wall coverings. Repair the north interior door. Seal the roof of the trailer by applying a seal coat.…