Abandonment of General Separation Area Eastern Groundwater monitoring wells HAA-12A, HAA-13A and HAA-15A.…
Chiller and HVAC units require periodic coil cleaning, the majority of these PM are yearly.…
Magnetic nanoparticles will be prepared and mixed with heavy crude oil to form a paste for induction heating and viscosity reduction.…
Install carpet and paint room A129 in 772-F.…
This EEC addresses the MT to design and install an interim replacement for the obsolete Glovebox Oxygen Monitors parts in the TritiumExtraction Fac…
Install hands free water dispensers in 704-C, 703-43A, and 704-N.…
Remove and replace floor tiles in select portions of the Purification Area within the K-Reactor, and prep and paint select wall locations.…
The 701-3H Entry Control Facility into the Tritium Limited Area, LA, is currently an unoccupied space.…
Remove both Uninterruptible Power Supply, UPS, systems in Building 234-H, Room 340 to provide addtional work space in the area.…
Under project Y757, the E3S system was replaced with the Argus Security System in 234-H.…