The ICW Booster Pump and motor need to be replaced due to age.…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforcedcompos…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…
Installation and operation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gasstandar…
Excavate to correct the underground domestic water leak Southeast of 281-15H…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…
The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the s…
Dominion Energy is installing fiber optic cables on top of 115 kV structures from 151-1K (Station 14) to 151-2C (Station 15-2).…
The process allows for obtaining simultaneous thermogravimetric and calorimetric measurements of materials (e.g catalysts).…