Repair chill water leak in Air Handling Unit number 4.…
Pending the completion of renovation activities in 773-A, B-147 and 151 Analytical Development Section (ADS) will install and operate an Agilent770…
SRNL will use an organic carrier to introduce a metallic or ceramic compound to the internal surface of a pinch weld and then conduct pinch weldtri…
Subcontractor will provide roof repairs at Building 716-4A.…
773-A, B135 and 139 is a multi-purpose laboratory equipped with instrumentation to process and or analyze liquid, solid, and gaseous samplesutilizi…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…