Testing will be performed in the 773-A E-wing Shielded Cells to assess the impact of increased fissile loading in glass on glass durability.…
The purpose of this activity is to modify/improve mechanical properties for a thermosetting polymer extrusion process.…
Replace existing General Services (GS) hydrogen supply isolation valves with new Safety Significant (SS) valves.…
705-H Replace ceiling tiles damaged due to water intrusion.…
This activity is needed for the placement of two (2) 44' x 52' concrete pads and three (3) sealands (263-289H, 263-290H, and 263-291H).…
Subcontractor will provide roof repairs at 225-6H. The Subcontractor “will not” disturb the existing roof while performing these repairs on 225-6H.…
Mount a utility pole and associated parts at the 730-1B Rally Point in order for a Solar Powered Wireless PA to be installed.…
Prepare nonradioactive salt simulant solutions that are representative of waste streams from SRS and offsite for testing.…
Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N and the 716-4N PECMC Propane Tank so Construction may replace the fa…
Renovations to 725-N, Room 1 flooring in Central Shops.…