This work will include replacement of two existing rooftop packaged HVAC units, HVAC-ACU-209024 and HVAC-ACU-209025, located on the 773-A D-Wing ro…
Install Wi-Fi in 707-59B.…
704-H Replace Damaged/stained ceiling tiles.…
Remove and repair/replace exhaust fan in bathroom/locker change room of Building 704-H to ensure proper air flow in common areas.…
Remount the first sink in the men's restroom in Building 706-19C.…
Remove damaged carpet, paneling, and correct drainage in 719-N.…
The flooring in 704-72S in the women's restroom has become saturated and is peeling up due to flooding issues in the past.…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
Excavate to expose damaged sewer pipe. Repair/replace pipe.…
This is an evaluation of the proposed NIOWAVE treatment process of degraded 30 percent tributyl phosphate (TBP)/70 percent dodecane solvent.…