Install backboards in phone room in 722-A.…
Subcontractor will provide roof repairs at 704-16B.…
Building 616-G has reached an end state and will be demolished.…
Scope of this work is to repair, reroof and recoat some of the roofs of buildings 234-H and 249-H.…
Soil Neutralization Amendments for the D-Area Coal Storage Area…
Upgrade 254-5H Diesel Fuel Level and Leak Detection System with a Pneumercator Level and Leak Detection System.…
Evaluate and repair crane solenoid and breaker that is intermittenly tripping on low lift crane at 681-3G.…
Relocating steam heater and associated electrical and piping per DCF.…
Install Overfill Prevention Device on the Underground Storage Tank at 703-6B Heliopad.…
Establish 3 new vadose zone lysimeter stations in E-Area on the north rim of ET3.…