719-N Prep and Paint 8 Concrete Bollards for High Visibility …
Pull sediment samples from settler tank for characterization and ultimate disposition.…
The Cyberex Inc Rectifier-Charger Model 130/106R3 is being replaced with the Hindle Power Station Float Battery Charger in Building 108-2K.…
This Scope provides the labor, material, and services to install additional personnel office space and restroom for supporting new missions in K-Ar…
Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for release of c…
Award Number: DE-EE0008730, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): SC, Office(s): Golden Field Office
Proposed activity covers those actions associated with cleaning and maintenance of lasers and associated optics owned by AD at SRNL (A Area).…
Subcontractor will provide roof repairs at Building 717-12F. The Subcontractor will not disturb the existing roof while performing these repairs on…
This proposed activity will repair damage to the 221-H roof in an HB-Line storage area resulting from scaffling being blown over during a storm eve…
The Sikaflex sealer in the joints at the Heavy Water Component Test Reactor (HWCTR) have degraded. The existing material will be removed via wire w…