Replace carpet in IT Area in 730-4B 1st Floor.…
SRNL will determine the moisture retention properties of various formulations of cementitious materials that are representative of SRS and offistew…
The activity consists of flowing Ar or N2 through a packed bed of porous zero valent iron (p-ZVI) to measure the pressure drop across the bed.…
Air gapping of mechanical lines to isolate building 236-H.…
Install WI-FI in 730-2B Room 204.…
Install additional 120V receptacles in Rooms 106, 107, and 185 of Building 703-47A.…
This project includes taking soil samples at the H, K, and L-Area Ash Basins, and conducting visual inspections for ash along transects todelineate…
Replace steps and decking at 235-11F.…
Push 3 CPTs down to lower part of Lower Aquifer Zone (LAZ) for lithology.…
Install a 250V, 20A, NEMA 6-20R receptacle with cover plates in room 126 of 773-52A.…