Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…
Subcontractor will provide roof replacement at Building 701-2L.…
SRSCRO will dismantle and remove D Area Metal Buildings including 484-15D D-Area Storage Building, 683-D Chlorine Building, ...…
Pump Corrshield MD4100 into Chilled Water Loop at 789-2B.…