Subcontractor will provide roof replacement at 742-A.…
This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry methodin 773-…
Subcontractor will perform roof repairs on Building 218-H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
Subcontractor will provide roof replacement at 736-A.…
Preparation of reagents and non-radioactive quality control standards in support of Analytical Laboratories.…
Graphene oxide nanoribbons will be mixed in with cements, mortars, grouts and concretes to test their performance changes.…
Subcontractor will perform roof repairs on Building 218-1H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
This EEC is written to cover characterization work associated with salt batch qualification samples.…
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals.…