Install outdoor shade sails in B-Area.…
Fabricate and process various agarose-based diffusive gradients in thin films (DGT) samplers.…
Replace Carpet on Second Floor in Building 730-2B.…
CX-020237: Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator
Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator.…
Replace Carpet in Room 1059 of Building 766-H.…
Replace Cove Base and Paint Room 125 in Building 707-7F.…
Correct and replace faulty electrical wiring between G2-681-3-ELNH-BKR-P1-2D and G2-681-3-ELNH-DISC-001 in 681-3G Pump House.…
Remove old doors and replace entry doors on Trailers 704-22G,704-23G and 704-25G.…
Perform cleaning, seal coating, and restriping of parking lot in F-Area. Clean and stripe main parking lot in F-Area.…
The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps grou…