Venting or direct-shipment and disposal of specialty gas cylinders, nitrogen, carbon dioxide, compressed air, in A Area.…
SRNL Research and Development Engineering will be conducting a fire suppression test in 723-A to support the Surplus Pu Disposition Project in K-Ar…
Install Universal Wiring, UW, drops in Building 730-2B.…
This proposed activity will install a spill containment box and vapor stimulator tubes at 254-5H Fuel Oil Underground Storage Tanks, FOUSTs, to all…
Subcontractor will provide roof repairs at 717-F.…
To provide building transition section, plenum, details for portable HVAC unit for 105-13K building.…
This ongoing activity includes the operation of several gas chromatographs and a liquid chromatograph and mass spectrometer in 735-A, 735-11A and 7…
Subcontractor will provide roof repairs at 706-6F.…
A vendor will generate and or remove excess wastewater from various systems and containments located across SRS.…
The 233-24H warehouse building heat pump is being replaced and utilizes slightly different controls.…