Approved herbicides, targeting Bahiagrass, will be applied inside/around various facility boundaries and on roadside/utility right of ways.…
Award Number: DE-EE0008842, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): SC, Office(s): Golden Field Office
Award Number: DE-EE0008294, CX(s) Applied: B5.15, State Energy Program, Location(s): SC, Office(s): Golden Field Office
This proposed activity will renovate men's and women's bathrooms on the fourth level of H Canyon.…
Sampling crew will Collect 1” x 18” sediment cores and surface water samples from the Steeds Pond Soil Contamination Area.…
Dispose of HEPA/Pre-filters to N-Area form IH Hood used to analyze potential asbestos samples.…
Four monitoring wells near the perimeter of the Mixed Waste Management Facility need the current deployed submersible pumps replaced with low flow …
This proposed activity will remove roofing on top of H Canyon and install a water-proofing system.…
Treatability Study in D-area to support D-Area Groundwater Remediation…
CX-021052: Remove Two PACM Gaskets from F Base Injection Flow Indicator Transmitter (flange) FIT-170
Remove two Presumed Asbestos Containing Material (PACM) gaskets from Flow Indicator Transmitter (CIS-FIT-170) at F Base Injection.…