This EEC applies to the cleaning, cutting and dissolution of Plutonium (Pu) metal.…
Subcontractor will provide roof replacement at 736-A.…
This activity involves the determination of Plutonium (Pu) and Neptunium (Np) in aqueous samples via the Control Potential Coulometry methodin 773-…
Subcontractor will provide roof replacement at 742-A.…
Subcontractor will perform roof repairs on Building 218-H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
Preparation of reagents and non-radioactive quality control standards in support of Analytical Laboratories.…
This EEC is written to cover characterization work associated with salt batch qualification samples.…
Subcontractor will perform roof repairs on Building 218-1H utilizing a Hydro-Stop system which includes foundation, fabric, and a final coat.…
Graphene oxide nanoribbons will be mixed in with cements, mortars, grouts and concretes to test their performance changes.…
These two methods determine the concentration of oxygen/nitrogen/hydrogen and carbon/sulfur in various materials.…