Two breathing air pass throughs are needed on the exterior walls of 234-7H to allow portable breathing air to be used within Building 234-7H.…
Install PA System from pole 265T to 716-4A.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radiounuclides through an artificial vadose…
This EEC covers the removal of 3 inlet HEPA Filters and the respective housings that were used to support Cabinet 26 operations in F091.…
This EEC covers the removal of the inlet HEPA Filters and the respective housings that were used to support Cabinet 25 operations in F091.…
In support of various R and D activities, this task involves the cleaning of metals using the additive Nitradd.…
High winds from a recent storm damaged a covered deck between buildings 22 and 23 within the MOX Complex Area.…
Modify the driving path of the Shielded Canister Transporter, SCT, to and from both S-Area Glass Waste Storage Buildings, GWSBs, 250-S and251-S, to…
A commercial vacuum induction furnace, Centorr System VII, will be used to make metallic samples using molds.…
The subcontractor, Queen City Railroad Construction, shall replace wooden line switch ties from the railroad bed, identified by site transportation…