Project Management & Construction Services (PMCS) operates an insulation fabrication shop at 717-10N.…
Construction personnel will renovate the interior of Building 701-1H.…
Install a new laboratory hood in Building 773-A, Lab B-147 and 151 along with two Spectrometers and supporting services.…
There is a need to set up three washing machines outside of 719-H in the Ambulance Bay.…
Re-caulk windows at the southeast and northeast corners of 730-B.…
Remove designated areas of crusher run and replace with asphalt.…
Site construction will clean the floor at Building 731-6N of bird droppings using a clorox bleach solution.…
Replace 16 1000W HID lighting fixtures in 717-F Jumper Shop bay with a comparable LED type, Lithonia Model number JHBL 45000LM ACL WDMVOLT GZ10 40K…
Repair chill water leak in Air Handling Unit number 4.…
Replace carpet, floor covering, and cove base in Building 707-F.…