In 108-1L, remove existing instrument air piping valves V-563, V-564, and V-565. Fabricate, hydro test, in-service leak test & install new spool p…
Subcontractor will provide roof repairs at Building 246-2H. The Subcontractor will disturb the existing roof while performing these repairs.…
Replace Valves V-36, V-152, V-87 and V-406 on Steam System. Valves V-36, V-87, and V-406 will also include replacement of presumed asbestos contai…
Replace PRV FP-PRV-003 at the Fire Water Pump House Building 902-3H. Valve is leaking and needs to be replaced. Valve is being replaced due to nor…
Repair insulation at steam stations and piping in Building 772-F & 772-1F Court Yard.…
Retrieval of several Filter Housings disposed of into Waste Container TF00003046.…
A new classified network will be added to 233-24H. Conduit will likely be ran underground between building 233-24H to building 249-H. There is a po…
Replace the two leaking roof drains on Building 234-H and 4" roof drain piping as applicable.…
This EEC is written to cover treatability work associated with the Salt Batch 11 Qualification samples.…
We will be releasing D2O to the atmosphere within the pine forest at SRS and sampling it downwind using Universal Gas Analyzers, bagging air sample…