Replace 218-2H Cooling Water Chemical Injection System. The existing chemical addition system for the 218-2H Cooling Water System is not providing…
Replace Valve F1-905102-WW-V-016 at 905-102F Process Deepwell.…
This EEC addresses the siting and installation of utilities (under ground electrical supply) of the new Storm Shelter 704-39G located at Burma Road…
This proposed activity entails having a roofing contractor perform concrete core drilling on the roof of H Canyon.…
Transition the existing Siemens PLC and touchscreen to an Emerson DeltaV controller and touchscreen operator workstation in cabinet H-234000-METL-C…
The K-Area Interim Surveillance (KIS) FM-200 fire suppression system will need to be redesigned to replace the soon to be discontinued Chemetron Fi…
Correct leak and replace valve SW-V-001(10") at 681-3G Pump House #3.…
This activity involves installing a MicroBlower™ at existing well MRS-34. Furthermore, three existing vadose zone wells (i.e., MVE-13, MVE-17, and…
Inspection and Treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF) and S/Z/J areas.…
Building 704-20N is a double-wide trailer that was used as an administrative office for radiological control operations personnel. The building's …