905-100F Remove suspect asbestos gasket material for repair of hole in pump piping at bottom left of Valve 19.…
Subcontractor will provide roof repairs at Building 731-3N. The Subcontractor will not disturb the existing roof while performing these repairs on …
Inspection and/or repairs to currently installed Main Feeder 13.8kva utility poles in and between C, N, and General Technical Areas.…
Inspection and/or repairs to currently installed Main Feeder utility poles within A and SRNL Technical Areas.…
Inspection and treatment of utility/power poles in the H Area (Canyon, HTF, General, ETF).…
This activity includes sorption and desorption of solids and aqueous solutions to determine distribution coefficients for various elements. This ac…
Zeolite molecular sieve is modified with boric acid by reaction of the zeolite with boric acid in water solution with the purpose of improving the …
This activity will encompass two (2) analytical methods that will be performed in 773-A, B-111: Interfacial Tension (IFT) and Oil/Grease Analysis b…
Evaluate and repair roof leak over Rooms 231 and 240 in Building 703-41A. The subcontractor will not disturb the existing roof while performing the…
This R&D activity will determine the heating capabilities of an oven for potential insertion in a process.…