Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self contained lowpower…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
Removal of asbestos containing material, ACM, and presumed asbestos containing material, PACM, from multiple ancillary buildings in thevicinity of …
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
Install two wall mounted HVAC units, or engineering approved equal, and any supporting electrical outlets or power sources.…
This scope is intended to cover the drying and compression of Calcium Chloride, CaCl2, salts.…
Plants will be germinated and treated with chemicals such as organophosphates and flowering promoters.…