The gaskets between the flanges on the #4 river water pump have to be removed. This will allow construction to bead blast the river water pump. The…
Where reasonable and economically feasible, replace High Intensity Discharge fixtures with light emitting diode equivalents. …
Replace the failed Automatic Transfer Switch (ATS-03) in Building 105-L. The model is not longer manufactured. Some disassembly and removal of elec…
Excavate and repair underground domestic water leak near Building 292-S.…
Abrasive blasting steel structures for coating applications performed by construction forces in the 725-2N Blast Building/Yard. …
This environmental evaluation checklist covers analytical methods to be performed in 773-A Labs B-003, B-046, B-105, B-107, B-138, B-145, B-154 and…
Savannah River National Laboratory will perform laboratory experimentation to determine the flowsheet parameters necessary to safely and efficientl…
The chilled water supply to the breathing air compressor (No. 2) after-cooler/moisture separator has a developed a leak in the ceiling adjacent to …
Replace positive crankcase ventilation 001 outlet isolation valves A1-901-SW-V-428 & A1-901-SW-V-429 at 901-A. Valves are leaking. Gaskets will be…
Remove suspect asbestos gaskets on discharge line at 905-103F.…