This work supports HB area by including, dissolution, separation/purification of Pu/Np solutions which may contain Pu, U, Fe, etc., via ion exchang…
Americium will be electrodeposited onto a solid substrate from an acidic media. …
A Non-Time Critical Removal Action will consist of an emulsified oil permeable barrier. Trees and vegetation will be cleared and lay-down areas cre…
Remove and re-install insulation housing from secondary chill water pump 006 at Building 785-6A. The asbestos inspection report found insulation to…
Excavate and repair underground Service Water link near Building 784-A. Leak is due to normal wear and tear. Replacement materials will be like-for…
Replace packing in Deepwell Pump 905-108H. Treat packing/gaskets as asbesto…
This proposed activity will install a tie-in connection for an alternate diesel generator in the event of extensive repair time for the permanent i…
Paint and seal exterior of Building 722-5A. Scope also includes repairing stucco, installing aluminum plates at foundation, replacement of caulking…
Repair bypass line on Deepwell 905-53A. Pipe is cracked. Welding is required and a weld map is needed. Also repair V-007 broken valve handle.…
Paint and seal exterior of Building 720-2A. Scope also includes repairing stucco, caulking, and prepping the stucco for painting. Paint interior an…