Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the s…
Office of NEPA Policy and Compliance
April 19, 2020Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the sandfilter roof at grade level.