Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…
Generate trace level dimethylmercury gas standards using a permeation tube and a Kintec calibration gas generator system.…
Remove receptacles and non-load-bearing wall, repaint walls, and replace carpet and baseboards in Building 773-63A, Rooms 10 and 11.…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
Install Portable Heaters and Diesel Generators to Provide Temporary Heat For Y708 Project Tie-Ins…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…
CO Monitor Calibration/PM of the Compressed Air Purification System in 108-1L…