Fabricate and process various agarose-based diffusive gradients in thin films (DGT) samplers.…
Replace Carpet on Second Floor in Building 730-2B.…
CX-020237: Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator
Install NALCO 3D Traser Cooling Tower Water Chemistry Control System at the 3H Evaporator.…
Correct and replace faulty electrical wiring between G2-681-3-ELNH-BKR-P1-2D and G2-681-3-ELNH-DISC-001 in 681-3G Pump House.…
Replace Cove Base and Paint Room 125 in Building 707-7F.…
Remove old doors and replace entry doors on Trailers 704-22G,704-23G and 704-25G.…
Replace Carpet in Room 1059 of Building 766-H.…
Perform cleaning, seal coating, and restriping of parking lot in F-Area. Clean and stripe main parking lot in F-Area.…
The activity includes designing, installing, and operating a new remediation well, similar to the existing remediation well RWM-18, that pumps grou…
A Non-Time Critical (NTC) Removal Action will be conducted for the C-Area Groundwater (CAGW) Operable Unit (OU) TCE plume. The NTC Removal Action w…