A subcontractor will design and construct a permeable reactive barrier (PRB) in the subsurface to intersect volatile organic compound (VOC) contami…
Correct/recoat phosphate chemical dike at 782-3A.…
Perform cleaning, seal coating, and restriping of 717-K NW Parking Lot.…
Install metal/cork strips around Room 76 in Building 707-F.…
McQuay Chiller #1 is an air-cooled unit which requires periodic coil cleaning. The Site Stormwater SME has received approval from SCDHEC for relea…
Installation of D-Area groundwater monitoring wells for data collection. …
Evaluate and repair crane solenoid and breaker that is intermittently tripping on low lift crane at 681-3G.…
The main objective of this project is to design, develop, additively manufacture, test, and validate three types (temperature, pressure, and blade …
Install sidewalk and replace damaged stairs at Building 226-2F.…
Remove presumed asbestos containing material (PACM) gaskets from flanges and conduct maintenance on relief valve PSV-012 (Pressure Safety Valve).…